Industrial Automation Parts. Prompt replies from real people.

Sourcing Tips

Short notes to help you send a complete enquiry and compare a quotation.

2026-11-26

Is Your PowerFlex 70 About to Be Discontinued? Check the Catalog Number First

Rockwell lists PowerFlex 70 catalog numbers as End of Life with discontinued dates of 1 December 2026, 30 May 2027 or 1 July 2027, depending on the exact catalog number. This article gives the verified dates and ratings for seven catalog numbers, explains what End of Life and Engineering Replacement mean in practice, and ends with a checklist for spares and migration planning.

Read note

2026-11-22

The S7-400 Kept Plants Running for Three Decades. Its Phase-Out Starts With the Safety CPUs.

The spare-parts cabinet tells the story before any memo does. In a process plant running a redundant S7-400H station, the shelf holds two CPUs, a spare memory card and a CP 443-1, and someone has already written the station's tag numbers on masking tape. That cabinet is the reason Siemens' latest phase-out announcement matters: the S7-400 is not a controller you swap on a whim, and the parts on that shelf now have a fixed calendar.

Read note

2026-11-21

S120 Combi Type A Is Cancelled — and Its Replacement Is Not a Drop-In

Four dates decide the SINAMICS S120 Combi Frame Type A retirement: phase-out announced 1 October 2025, last new-part orders 30 September 2026, product cancellation 1 October 2026, and repair and spare-parts support scheduled to run until 1 October 2035. The newer Frame Type B remains on sale, but Siemens states that hard substitution between FTA and FTB is not available.

Read note

2026-11-18

Allen-Bradley 1734-ADN Ends 31 December 2026: Your POINT I/O DeviceNet Rack Has No Direct Replacement

Open a control panel on a line that has run for fifteen years and you will probably find it on the left end of a POINT I/O rack: a grey module with a two-digit node display, five screw terminals on a cream-coloured block, and a label that reads 1734-ADN. It is the adapter that ties up to 63 POINT I/O modules to a DeviceNet network, and it has done that job, quietly, for more than two decades. On 31 December 2026, Rockwell Automation stops selling it — and Rockwell names no replacement.

Read note

2026-11-15

The Quantum 140 Refused to Retire for Thirty Years. Now Canada Ends Its Factory Service.

A maintenance engineer in Ontario opens the spares cabinet and counts the Quantum CPUs on the shelf. One 140CPU65160, bought years ago as insurance against a failure that never came. The rack beside it has run since the plant was built, and the CPU inside it has not been orderable for years. None of that changes on 31 December 2026. What changes is quieter: on that date, under Schneider Electric's Canadian lifecycle record, standard manufacturer service — repair and spare-parts support — ends for three Quantum 140 CPUs at once. The shelf spare is still a spare. The question is whether the plant knows exactly which references it holds, and what replaces them when the next failure comes.

Read note

2026-11-02

Sourcing Discontinued Schneider Modicon Premium, Quantum and Altivar Parts

Schneider Electric has retired the Modicon Premium and Quantum PLC lines and the Altivar 61/71 drive families — Premium and Quantum gave way to the Modicon M580, the ATV61/71 to the Altivar Process ATV630/930 generation. The installed base did not retire with them. Water plants, mines, cement works and building services still run TSX Premium racks, Quantum hot-standby pairs and ATV71 drives every day, and when something fails, the spare has to come from the sourcing market. Schneider references are precise, but only if you read them completely.

Read note

Need help finding a part?

Send your model and quantity. Our team aims to reply promptly during office hours.